$1,020,000

The scope includes design, engineering, fabrication, installation and commissioning of 6 sets of steam extracting systems. The project is to solve the issue of excessive moisture and corrosion caused from steam coming out from the hoppers. The uncontrolled steam from the hoppers was causing a detrimental impact on the main drive motors

  •  